Loading the kiln 1 13
After a long time the kiln was loaded today.
This time only dark stone-surface pots will be fired.
Together with the pots 40 tiles with glazetests and a few "quicktests" were placed in the kiln.
We can't wait to open the kiln in a few days.
"Sir yes Sir...."
Our little glaze-soldiers.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)